
The hotel is now open
We bought and took over a hotel building that was well underway and up to 3 storeys high.
The hotel was a largely raw shell when we took it over, which made it possible to radically change the floor plan, facade, window sizes, etc.
We have changed EVERYTHING. One big thing is that we've added a lift to the hotel. This is important as we have built the hotel up to 7.5 storeys high with a large roof terrace.
The process has been a HUGE task, but also super exciting, as we can make our own mark right from the start. Just getting the building materials shipped to the island is a major task. We can't just drive to the Stark DIY store and pick up what we need. The hotel is now open - we opened in autumn 2025.
Follow us on Instagram β· where you can see many more photos. Follow us on TikTok β·



